Production Run Time
Estimate shots and scheduled press hours for a good-part order after yield and runtime-efficiency losses.
Example starting values are prefilled to demonstrate the calculation. Replace them with your measured, quoted, or job-specific inputs before relying on a result.
Result
Attempted parts from full shots (parts)
10,208
Runtime allowance from entered efficiency (h)
3.753
Expected good parts at entered yield (parts)
10,003.84
Ideal molding time (h)
21.267
Required full shots (shots)
2,552
Production Run Time (h)
25.020
Planning assumptions and limits
The shot count is rounded up to a whole cycle. Expected good parts are a statistical expectation from the entered overall yield, not a guaranteed count; actual rejects may vary by cavity and over time. Runtime efficiency is applied separately to ideal molding hours. Setup and startup shots are excluded and should be planned separately.
Related calculators
Resin Purchase Quantity
Turn a good-part order into production shots, startup allowance, and the virgin resin quantity to purchase.
Open calculatorResin Dryer Working Inventory Estimate
Estimate the resin mass that must be available in a dryer hopper for a chosen feed rate and residence time.
Open calculatorParts per Hour
Show ideal cycle capacity alongside expected good parts per hour after planned runtime and yield losses.
Open calculatorRequired Shots and Whole-Shot Output
Find the whole shots needed to reach a part target and see the surplus created by the last shot.