Machine Time Cost per Part
Allocate a press hourly rate across cycle time and cavities, then adjust the result for accepted yield.
Example starting values are prefilled to demonstrate the calculation. Replace them with your measured, quoted, or job-specific inputs before relying on a result.
Result
Expected machine cost (USD/1,000 good parts)
156.25
Expected machine cost per good part (USD/part)
0.156
Theoretical cost per molded piece (USD/part)
0.156
Machine-cost scope and limits
Theoretical cost assumes every active cavity produces one part each cycle. Expected good-part cost divides by the entered overall yield. The result does not add setup, downtime, maintenance, energy, labor, overhead, or freight unless those are already embedded in the hourly rate; confirm the charge-rate and yield definitions before quoting.
Related calculators
Injection Mold Quote Roll-up
Roll supplier tooling line items into a clear mold-build subtotal, delivery additions, and quoted total.
Open calculatorSecondary Operation Cost per Part
Estimate direct trimming, assembly, inspection, or other secondary-operation cost per part from time and rate.
Open calculatorMolded Part Cost Worksheet
Add allocated material, press, tooling, labor, and other costs to build a per-good-part quote baseline.
Open calculatorResin Material Cost per Part
Price the resin portion of one accepted part from chargeable mass and the supplier’s material price.
Open calculator