Add measured molding phases together while making the hold and cooling overlap explicit.

Example starting values are prefilled to demonstrate the calculation. Replace them with your measured, quoted, or job-specific inputs before relying on a result.

Inputs

Cycle trace phase inputs

Range: at least 0 s

Elapsed fill/injection phase from the machine cycle trace.

Range: at least 0 s

Elapsed hold/pack phase. If cooling duration is entered as total time after fill, choose that convention below so this phase is not added twice.

Range: at least 0 s

Enter either cooling after hold or total cooling after fill, as specified in the next field.

Match the phase timestamps in the machine cycle trace. In the includes-hold case, elapsed post-fill time is max(hold, cooling), not hold + cooling.

Range: at least 0 s

Elapsed portion of the cycle not already included in injection/hold/cooling timing. Do not enter concurrent time twice.

Result

Injection/fill share of cycle
0.1
Open/eject/close share of cycle
0.2
Post-fill share of cycle
0.8
Elapsed post-fill interval (s)
20.00
Total elapsed molding cycle (s)
26.00
Timing convention
Total elapsed cycle = injection/fill + mold-open/eject/close + post-fill interval. If cooling is additional after hold, post-fill interval = hold + cooling. If cooling already includes hold, post-fill interval = max(hold, cooling). The selected convention must match machine trace phase timestamps; concurrent phases must not be summed twice.