Skip to content

Required Shots and Whole-Shot Output

Find the whole shots needed to reach a part target and see the surplus created by the last shot.

Example starting values are prefilled to demonstrate the calculation. Replace them with your measured, quoted, or job-specific inputs before relying on a result.

Inputs

Gross production target

Range: at least 1 parts

Enter a whole-number count; decimal values are rejected during calculation.

Range: at least 1 cavities

Enter a whole-number count; decimal values are rejected during calculation.

Result

Required full molding shots (shots)
3
Whole-shot surplus over target (parts)
2
Theoretical parts from full shots (parts)
12
Planning assumptions
This plans full molding shots assuming each listed active cavity produces one accepted part on every cycle. Add rejected/startup shots and downtime separately when planning actual delivery. It does not estimate mold life.

Related calculators